YD-5DW Single-sided vertical automatic positioning and balancing machine

YD-5DW Single-sided vertical automatic positioning and balancing machine

It is mainly used for dynamic balancing test of disc-shaped workpieces such as fan blades, water pump impellers, range hood wind wheels, flywheels, grinding wheels, saw blades, chucks, saw blades and brakes. The unit can also be equipped with a de-duty device according to user requirements.

key word:

Wind wheel single-sided vertical balancing machine economic dynamic balancing instrument flywheel dynamic balancing machine
  • Description
  • Image display
  • Product parameters
  • Customer site
  • Troubleshooting
  • Product features

    Keep Improving Pursue Perfection

    Set many advantages in one, only to give customers the perfect dynamic balance detection, so that customers feel more at ease

     
     
     
     
     
     
     
     

    It can be equipped with the deweighting device

    according to the user's requirement

    It has simple operation and convenient loading

    and unloading

    Equipped with special fixture, higher precision

    Because of professional, so trust

    Technical parameters

    The structural parameters

     

    65cm

    45cm

     
     
     
     
     

    0.05/0.4servo

     

    Gauge,

    And the number

    Workpiece quality

    range(kg)

    5

    Maximum outside diam

    eter of workpiece (mm)

    Φ350

    Motor power (KW)

    Workpiece height (mm)

    120

     

    Imbalance reduction

    rate (U RR) %

    Minimum reachable res

    idual unbalance (E mar)

    95%

    ≦2g.mm/kg

    The basic informationProduct parameters

    Higher efficiency

    Vulnerable

    artifacts:

     

    One year warranty for mechanical parts, one year warranty for

    electrical parts, one year warranty for electronic components

    Replacement of all kinds of idle old, old and residual dynamic balancing

    machine equipment purchased by the enterprise in the early stage,

    replacement scheme is determined according to the actual field

    investigation results;

    The prophase purchase of zhuoxuanjin dynamic balancing machine

    equipment due to idle, and there are new products need to re-purchase

    dynamic balancing machine, can consider the way of exchange

    cooperation;

    Home delivery, free arrangements for personnel home transfer

    and training guidance;

    Professional after-sales staff 24 hours telephone video voice

    guidance sudden operation change and forget to operate and

    other problems

    Equipment lifetime maintenance, wearing parts to provide

    lasting, so that the use of equipment more assured

     

    The workpiece speed range is in:1000-3500 3500-8500

                                                           8500-30000

    Production demand: large variety quantity, small variety

                                      quantity and small variety quantity;

    Product industry, varieties, specifications, weight, shape, size;

    Balance

    correction:

    Feeding (adding mud, clamping, ring,welding,... )

    Cutting (cutting, drilling, milling, grinding,planing,

    scraping,... )

    Balance levels range fromG40、G16、G6.3、G2.5、G1、G0.4

    The initial measurement is qualified and the number of thick

    grooves in the outer diameter of the rotor is measured

     
     

    Member's Rights

    1、Date Of Delivery

    Normal production period is 6 working days (can be booked in advance)

    2、Payment Method

    Down payment deposit to arrange production

    3、Quality Criterion

    1.Product manufacturing standardGB4201-2006/ISO2953:1999
    2.The product manufacturing requirements shall be strictly in accordance

    with the technical requirements determined by both parties

    4、Guarantee Period

    The "three guarantees" period of party b's products shall be one year, and

    after-sales service shall still be provided one year later.

    5、Product Acceptance

    1.Check and accept the equipment in the supplier's workshop. Check and verify

    the rotor test.
    2.The equipment shall be inspected and accepted by the user on site. The inspection

    shall be carried out in accordance with the technologies determined by both parties

    in the early stage, and the basic operation training shall be completed.

     

    6、After-Sales Service

    1.The supplier is responsible for providing training services for the equipment ordered bythe

    purchaser, such as operation balance calculation and troubleshooting.
    2.In case of equipment failure, the company will support the response in the fastest way
    after

    receiving the notification from the user.The arrival time shall not exceed 48 hours, andthe

    maintenance work shall be carried out (after that. If the equipment is in the period of three

    guarantees, only the transportation fee for the personnel shall be charged, and the travel

    expense for the personnel shall be charged, and the cost fee for the replacement of the

    accessories shall be charged).
    3.The company is responsible for the maintenance of equipment after three packages

    andprovide spare parts supply services.

  • YD-5DW

Get product quotes for free


Security verification
Submit